GAS PIPELINE
The Poseidon project includes:
The compression station in Thesprotia Prefecture;
The onshore pipeline between the compression station and the Greek landfall;
The offshore pipeline between the Greek and Italian landfalls;
The onshore pipeline between the Italian landfall and the measuring station;
The measuring station in Otranto.


GAS PIPELINE
spacer
The initial capacity of the pipeline will be divided in:
spacer
Exempted Capacity, equal to 1.015 Million Normal Cubic metres per hour (approximately 8 billion cubic metres per year)
spacer
Open Season Capacity: to be determined through the Open Season procedure

Length: 207 km
Maximum depth: 1.370 metres
Diameter: 32 inches (80 cm)
Investment forecast: € 500 million
Forecast start of operation: 2015

spacer spacer spacer
 
  bullet THE GAS CORRIDOR
spacer bullet THE STRATEGIC VALUE
spacer bullet GAS PIPELINE
spacer bullet TIMELINE
spacer
 
 
Focus on GAS
QeA
 
spacer
spacercontacts | links | credits
spacer
spacer